Skip to main content
Foredge

Case Study

Manufacturing Plant Network

Industrial network upgrade across production floors.

Industry
Manufacturing
Region
Asia-Pacific
Deployment scale
24/7 hardened production operation
Products used
IS1024GS-8F-4TF, SF412A-LC-10KM, HDAC-QSFP28-100G-3M +1 more
Deployment overview — schematic

Challenge

A multi-plant manufacturer's production floors ran on unmanaged switching in DIN-rail cabinets, with OT traffic, CCTV and office IT sharing unsegmented segments.

Fiber runs between halls and to remote yard equipment exceeded what office-grade media converters could reliably cover, and there was no central view of any of it.

Solution

Deployed IS1024GS-8F-4TF hardened DIN-rail switches on the production floors with managed per-port and PoE control, segmenting OT, CCTV and IT traffic.

Built the inter-hall fiber backbone on SF412A-LC-10KM single-mode optics, with HDAC-QSFP28-100G-3M harnesses inside cabinets.

Extended coverage to yards and outbuildings with W768OAP outdoor Wi-Fi 7 APs, all brought under Apollo cloud management for a single OT/IT view.

Results

  • Production floors moved from unmanaged to managed, segmented switching with per-port visibility.
  • Inter-hall backbone standardized on qualified 10 km optics, retiring the media-converter sprawl.
  • Plant network now auditable from one management plane across wired, fiber and outdoor wireless.

Next case study: Regional Cloud Provider4,000-GPU cluster fabric rollout.